Most manufacturers think specification selling means getting a datasheet onto an engineer's desk. It doesn't. It's the work of getting your product written into the design before anyone asks for a price, and then protecting it all the way to site.
I've done it in marine engine rooms, London towers and process plants. The mechanics change by sector. The discipline doesn't.
Let me be clear about what the spec does. Being named in the specification tilts the odds hard in your favour. It's the single biggest lever a manufacturer has on a project. It isn't pass or fail.
Plenty of work is won from the approved vendor list on the strength of the EPC relationship, the operator's preferences, the budget and a sharp commercial case. I wrote about that side in Breaking the Spec. Specification selling is about starting every project with the odds already leaning your way.
Engineers don't redesign because a salesman turned up. They redesign because something forces them to. Find that force and you've found your way in.
At Gilkes, the engine cooling pump business in Kendal, I spotted a change in emissions regulation. Engine manufacturers were going to have to update their engines, and that opened a window to redesign the pumps for the new builds. So I went round every engine manufacturer I could reach, globally, and opened the conversation on the regulations, not on the product.
That bought early access to the redesign work. Marine engines first, then rail, then some of the larger truck engines. Most of the 508% growth, from £2.5M to £15.2M, came from that one insight.
Marine shows how regulation drives redesign. The IMO's NOx rules under MARPOL Annex VI apply to installed marine diesel engines over 130 kW and step up in tiers by ship construction date, with Tier III applying in designated Emission Control Areas. In my experience every step like that sends engine builders back to the drawing board, and every return to the drawing board is a door.
Lead with the change they're facing, not the product you're selling. The product only matters once they've let you into the redesign.
The spec is rarely one person's decision. It's a chain, and each link can make or break you.
On Bishopsgate in London I was selling Brannan's pressure gauges and thermometers. WSP, the consultant, made the initial decision to specify Brannan. That was the start, not the finish. Multiplex, the main contractor, then needed the confidence to actually use the product. Hotchkiss, the MEP contractor, had to buy through Wolseley, our partner, who held the relationship.
So I worked every one of them. The developers, the consultant, the main contractor, the MEP contractor and the merchant. I made sure Wolseley kept me in the conversation, and I talked to the contractor so we had product ready when the site needed it.
By the time I asked for the order, I already knew we had it. Several people upstream had told me they were using Brannan. There's more on that kind of work on the construction and building products page.
This is what I'd put in front of any manufacturer starting a specification programme.
Specification work takes time, and long cycles kill momentum. At Gilkes, cycles of 18 to 24 months came down to around 12 through deal control, stakeholder mapping, relentless follow ups, face to face meetings and direct engagement with the technical teams.
Once you're inside the design, your expertise has a value. On a low volume marine programme with GE, we charged for the pump design work. It was the first time in Gilkes' very long history that they'd done that. If the engineering is good enough to be specified, it's good enough to be paid for.
Most specification programmes don't fail on product. They fail because nobody owns them. The sales team's chasing this quarter's orders, and the design conversations happening two years out get left to chance.
If that's where you are, that's the gap a Fractional Commercial Director fills. I own the programme, map the chain and run it to site. If you want to talk through where your product could get designed in, book a 20 minute call.